Capabilities

How we manufacture certified plastic parts

From first drawing to certified shipment — the process, equipment and quality standards behind every part we produce.

Our Process

Design → Tooling → Production → QC

1

Design

Share drawings, 3D files or a concept — our engineers review for manufacturability (DFM) and flag design improvements before tooling starts.

2

Tooling

In-house mold design, CNC machining and EDM produce your tooling, validated with T1 sampling and trial reports before production sign-off.

3

Production

Parts run on calibrated injection presses (50T–650T) with in-process checks at set intervals to catch drift before it reaches a shipment.

4

Quality Control

Every batch is individually inspected and certified — dimensional reports, material traceability and export documentation included.

Equipment

What's on the floor

In-house tooling and production equipment — no outsourced bottlenecks.

Certifications & Quality Standards

Every order ships under the same certified quality system — no exceptions.

  • Individually certified quality management system
  • Individual batch certification on every order
  • Full dimensional inspection reports
  • Material traceability documentation
  • Export documentation verified for Sri Lanka & Malaysia

Lead Times

What to expect from RFQ to delivery.

RFQ Response24-48 hours
Mold Tooling4-6 weeks
T1 Sample & Trial3-5 days after tooling
Production Run2-4 weeks (volume dependent)
Rush OptionsAvailable on request
Customization

Options beyond the standard run

Want the specifics for your part?

Send your drawings and we'll map them to our process and timeline.

Request QuoteChat on WhatsApp